Designing a data center to meet LEED specifications required a systems approach to minimize both energy and water usage.

Entrance of the NNT Global Campus building

Value Delivered

With Phoenix PH1, along with all other NTT data centers on the Phoenix campus, targeting LEED for Core and Shell, Havel was committed to optimizing the project’s power and energy performance throughout the campus. The mechanical, electrical, plumbing, and fire protection systems were designed and built for maximum energy conservation and minimum water usage. 

Client Objectives

Because of the data center market’s growth in the greater Phoenix area, and in order to further their strategic initiative to rapidly expand their portfolio, NTT wanted to build a new data center campus in Mesa.

Solutions

Being their most tenured and experienced building controls partner in the U.S., Havel was awarded the NTT contracts for PH 1, 2, and 3 through Schneider Electric.

Included in our scope of work:

  • Full turnkey solutions including design, installation, programming, and commissioning of the building management system (BMS) and the electrical power management system (EPMS).
  • Monitoring and control of the BMS for chillers, fan coil walls, and rooftop air handling units.
  • Monitoring of the EPMS for generators, power distribution units, automatic transfer switches, uninterruptable power supplies, and electrical modules. 

Campus features:

  • Seven buildings for a total of 240 MW of critical IT load
  • 21,000 square foot data vaults
  • Six MW of critical IT load per data vault
  • Full generator redundancy with 24-hour fuel capacity
     

Client Background

Global Data Centers, a division of NTT Ltd, provides a global platform that is one of the largest in the world, spanning more than 20 countries and regions.